Self Driving
Experimental. Self Driving acts for you without asking first. It can make mistakes, and it spends credits for as long as it is on. Try it on work you can check, and turn it off when you want the wheel back.
Self Driving hands your project to Avi. You step back; Avi decides what matters, does the work in your apps, and keeps going until you stop it.
Your Personal project already has it. It sits in Automations as Self Driving, stopped, until you turn it on. Only you can turn it on.
Before the first drive
Because it is already there, you can set it up before it does anything. Open Automations → Self Driving and:
- fill in its Custom instructions: what to focus on, what to leave alone, and what to always ask you before doing;
- check its max daily spend.
Turning it on
Open the ⋮ menu in the message box and choose Self Driving.
While it is on, the place where your conversation normally is shows Self Driving instead. Everything else on screen stays where you left it; nothing switches by itself.
- At the top: the model it is running on, how long it has been running, and the credits it has used so far.
- Under that, four counts: to do, in progress, needs you, done.
- Then its list: what it is working on right now, each with a short line saying where it stands, followed by what it will do next, in order. The list is titled Plan. What it is working on right now is always at the top. When an item is about one of your tasks or a calendar event, that task's or event's title is shown in small type just above it, with the app's icon.
You do not need to touch it. The list keeps itself current and never needs scrolling. Finished items and anything waiting on you leave the list and show in the counts.
Your message box stays under it, and while Self Driving is on, what you type there goes to Self Driving. Use it to change course: "leave the vendor contract to me", "do the board deck first". The last thing you sent shows just above the box.
Each time you turn it on, your Updates feed gets one Self Driving entry for that run. It says when it started, keeps its counts current while it runs, and ends with how long it ran and what it got done. Open it to read what it did: each item it finishes adds a line saying what it was and how it ended.
Stopping it
Press Stop at the top of the Self Driving view, or open the ⋮ menu and choose Stop Self Driving. Whatever it was doing stops, and your conversation comes back. Stopping it from Automations does the same.
What it does
Each time it looks, Self Driving:
- Looks at its work list, every open task, your calendar, your open Needs you requests, your newest updates, new mail and messages, and the goals in your project's memory.
- Plans into its work list, in the order it will work: anything with a clock on it today and anyone waiting on you, then your open tasks in the order you ranked them, highest priority first (it does not skip a high-priority task for an easier one: if the task is big it starts on its first step, and if it cannot move without you it says what it needs and takes the next one down), then updates that call for work, then the next step on your goals.
- Does the top item, then the next, and the next: several pieces of real work each time, such as a reply sent, a document written or a task completed. Every open task counts as work to do, with or without a due date.
- Keeps the list current as it goes: what it is working on, where that stands, and what it finished. It marks an item as in progress before it touches anything for it. Avi holds it to that: while nothing on the list is in progress, Self Driving cannot change anything in your apps.
- Carries straight on: while any work is still open, the next look starts the moment this one ends, so you never see it stop. Only when nothing is open does it wait, up to an hour, before looking again.
When work is big or unclear it does the part it can, notes what is left, and moves on. When it needs something only you have, it marks that item as needing you and carries straight on with the next one. You get a Needs you request the moment it marks the item: one request that lists everything on its list that is waiting on you, kept current as that changes. Answer it and Self Driving picks the item up again. Stopping Self Driving takes the request away.
Between looks the Self Driving view says when the next one is.
Its work list
Self Driving keeps its own work list: everything it has decided to do, in the order it will do it. You can watch it while it drives.
- An item can be anything: one of your tasks, an email to answer, a meeting to book, the next step on a goal. Each says where it came from.
- An item about one of your tasks or calendar events shows its title above it.
- The item it is working on carries one short line saying where it stands, rewritten as the work moves forward.
- An item that is waiting on something only you have is marked as needing you, and says what.
- A finished item says how it ended. That line shows on Self Driving's entry in your Updates feed the moment the item is finished.
- Nothing leaves the list unless Self Driving drops it because it no longer needs doing, so items do not come and go while you watch.
The list is separate from your Tasks app. Self Driving works your tasks: it completes them and writes on each what it did. It does not fill your Tasks app with its own planning. A task that no longer needs doing is marked Cancelled with a note, and it never deletes your tasks.
Each drive has its own list. When you stop Self Driving and start it again, it starts with a fresh, empty list and plans again from what is true now. Anything the last drive left unfinished is passed along as a reminder to check, not as a fact.
How it works with you
- It finishes things. Done means the real outcome happened: sent, published, booked, completed. A draft that is waiting to be sent is not counted as done. If the last step needs something only you have, the item is marked as needing you and says exactly what.
- It works in your tasks. When it starts one of your tasks it sets it In Progress, keeps the task's notes current as it goes (where things stand, the next step, what it found, where the result is), and marks it Complete only when it is really finished.
- It checks before it starts. If a piece of work needs an account connected, data it does not have or a decision from you, it asks first and does other work meanwhile.
- It tells you only what it has checked.
What it can and cannot do
- It uses every tool that is switched on in your project: it can write, send, schedule and edit, not just read.
- It does not start with the tools that delete, remove, cancel or disconnect things. If it needs one, it asks you first, like any automation that runs unattended.
- If a computer is connected to your project and its tools are on there, Self Driving has them too: it can run commands and work with files on that computer. Switch them off in its Tools tab if you do not want that.
- It reads your Needs you requests but never answers them for you. It does the work around them and leaves the decision to you.
- It cannot end itself. It keeps going until you stop it, until it reaches its max daily spend (raise the limit to bring it back), or until five sessions in a row fail.
Telling it how to drive
Self Driving is an automation like any other. Open Automations → Self Driving to:
- change its Custom instructions at any time. They win over its built-in method;
- read its Built-in instructions, the method described above;
- see every session it ran and exactly what it did in each;
- read its Activity, one line for each thing it finished;
- change its max daily spend.
If you delete it, your project gets a fresh one, stopped, with its Custom instructions empty again. If you archive it, it stays archived: unarchive it, or turn Self Driving on again, and the same one comes back with everything it had.
Stopping it there and resuming it is the same switch as the one in the message box. Resumed from there it starts its next look about five minutes later; turned on from the message box it starts looking at once.
Goals
Self Driving works toward the goals in your project's memory (Project settings → Memory → Goals), in the order you ranked them. Keep that list current and it knows what to push on once your tasks and inbox are handled. With no goals written down it still works through your open tasks and whatever comes in.